John Hardward Society - Converting office spaces into 15 residential rooms

Our scope included mechanical HVAC work to support the change of use, ensuring full compliance with the Ontario Building Code and City of Toronto requirements. The system was designed and installed to provide efficient heating, cooling, ventilation, and exhaust suitable for a residential care home environment.The work required careful coordination within an existing occupied building, maintaining life safety systems, fire separations, and uninterrupted services to surrounding areas. All ductwork, ventilation, and exhaust systems were installed and inspected in accordance with approved mechanical drawings and municipal inspection stages.

About Project
Budget
$250,000
Address
1669 Eglinton Ave West, Toronto, Ontario
Type of project
Commercial
Role
Mechanical Contractor
Scope of work
Design, Permit, HVAC, Electrical, Plumbing
Client
MTP Construction

Testimonial

We our clients has to say